top of page

Location    : Ashland, Oregon

Client        : Ashland School District 5
Type          : Educational - renovation
Size           : 65,000 sqft
Status        : Completed
Year           : 2022

Collaborators & Consultants
HMK Co. (Project Manager)

Adroit Construction Co., Inc. (Contractor)

Covey|Pardee,

CIOTA Engineering, Powell Engineering,

Douglas Engineering Pacific,

Brightworks Consulting

Design Team 

Soderstrom Architects, Christopher Brown,

Jane Alexanderr, Liz Gilbert, Peter Su, Tavjot Singh,

Michael Castro, Gulia Iskhakova

Ashland School District’s (ASD) Ashland Middle School/TRAILS, is a one-storey school of approximately 106,484 sqft, with a separate detached classroom wing for grades 7/8 and a gymnasium structure. The project is broken up into two separate school renovations that share the same campus providing exterior and interior renovations along with general accessibility and restroom upgrades. The TRAILS is to be relocated to the existing south wing, which will be reconfigured for its proprietary use.

Ashland School District’s Ashland Middle School/John Muir Outdoor School remodeled by Arkitek, is a one-storey school with a separate detached classroom wing for grades 7/8 and a gymnasium structure. The project is broken up into two separate school renovations that share the same campus providing exterior and interior renovations along with general accessibility and restroom upgrades.

Proposed new construction

TRAILS

Ashland
Middle
School

Existing
7th-8th Grade
Building - NIC

Existing
Play Field - NIC

Existing
Sports Field - NIC

Existing
LG Building -
NIC

Existing
Play Field - NIC

Existing
Soccer Field - NIC

Proposed renovation

Ashland School District’s Ashland Middle School/John Muir Outdoor School remodeled by Arkitek, is a one-storey school with a separate detached classroom wing for grades 7/8 and a gymnasium structure. The project is broken up into two separate school renovations that share the same campus providing exterior and interior renovations along with general accessibility and restroom upgrades.
Website Pages.jpg
bottom of page